Apply bead of sealant down around the -
20 braces: specifically, where they meet
with the -13 plate. Seal over flat head
fasteners and pin holes.
Use the graphic to the right as a guide for
where to place down beads of sealant. This
is the front side of the Q7 cabinets. Place a
bead of Alex + down at every single joint
between a batten and finished plate. You
will also have to lay down a few beads in
between divider plates to isolate
compartments. Make sure all beads are
unbroken and thorough.
Keep sealant away from the copper, if
sealant does get on the copper clean with a
microfiber towel and windex only.
43 |
P a g e
Summary of Contents for Q7
Page 1: ...Q7 Assembly Procedure 1 P a g e...
Page 7: ...6 P a g e...
Page 12: ...10 P a g e...
Page 17: ...14 P a g e...
Page 19: ...15 P a g e...
Page 23: ...18 P a g e...
Page 25: ...19 P a g e...
Page 38: ...31 P a g e...
Page 48: ...Install BH5 in all places shown 41 P a g e...
Page 49: ...42 P a g e...
Page 69: ...62 P a g e...