Place tape down on topside ledge of
baseplate. Cut 2 pieces of gaff tape 1” x
3”, cut 4 pieces of blue painter’s tape 1” x
3”. Place down gaff tape first and then
cover with 2 pieces of blue painter’s tape.
Slowly push faceplate back to close up
the front of the cabinet. You have to lift
faceplate as you push it in to get it over
the layers of tape and avoid hitting the
base-plate. Those layers of tape should
allow the faceplate to sit flush with the -
01.
Make sure faceplate corners are flush with
the -01. If faceplate sits lower than -01,
pull the faceplate open and add more blue
painters tape. Once flush, insert all rod
bolts, do not forget the x5 in the upper
cab.
Locate, unwrap and QC Q7-78.
Unwrap and QC Binding Posts.
Remove set screw near ends of binding
posts, set aside to use again later.
Remove internal collar from binding post.
Remove Lock nut from binding post using
a 14mm wrench. Install binding posts in to
Q7-78, black on left and red on right.
Reinstall lock nut but do not overtighten, it is
possible to crack the plastic washers.
59 |
P a g e
Summary of Contents for Q7
Page 1: ...Q7 Assembly Procedure 1 P a g e...
Page 7: ...6 P a g e...
Page 12: ...10 P a g e...
Page 17: ...14 P a g e...
Page 19: ...15 P a g e...
Page 23: ...18 P a g e...
Page 25: ...19 P a g e...
Page 38: ...31 P a g e...
Page 48: ...Install BH5 in all places shown 41 P a g e...
Page 49: ...42 P a g e...
Page 69: ...62 P a g e...