214658
50
Revision A
4.4.2
Installing Flighting Extensions
Follow these steps to install the long flighting extensions required for a 1 m (40 in.) feeder house:
1007689
A
Figure 4.45: Left Extension
–
Right Opposite
1.
Remove the two flighting extensions (A) that are
strapped to the auger.
1006481
A
Figure 4.46: Access Holes in Auger
2.
Remove two access covers (A), one on each side of the
center.
1007495
A
B
Figure 4.47: Short Flighting Extension
3.
Remove hardware (A) securing existing left and right
auger flighting extensions (B) and remove extensions.
Retain hardware.
Summary of Contents for PW8
Page 2: ...PW8 Pick Up Header 1006866 Published June 2018...
Page 8: ......
Page 22: ......
Page 168: ......
Page 169: ......