UNLOADING AND ASSEMBLY
Form # 169242
Model Year - 2009
36
STEP 16. INSTALL STEPS
The following procedure is applicable
to the M150 and M200 machines with
LH and RH platforms. The M100 has
a LH platform only. RH installation is
shown, LH installation is opposite.
a. Install two ½ in.x1.0 hex bolts in upper holes in
platform. Do not thread in fully.
b. Remove step assemblies from shipping frame.
Retain hardware.
c. Hang step assembly on bolts. Both step
assemblies are the same.
d. Install two ½ in.x1.0 lg. hex bolts in lower holes
in step and tighten.
e. Tighten upper bolts.
f. Repeat for other step assembly.
STEP 17. INSTALL TOOLBOX
a. Open maintenance platform on LH side.
b. Attach toolbox holder to brackets on the frame
with two 3/8 in.x0.75 lg. carriage bolts and nuts.
c. Locate toolbox in holder.
d. Position hose bundle in hook on tool box holder.
Note provision for grease gun holder.