UNLOADING AND ASSEMBLY
Form # 169242
Model Year - 2009
53
HYDRAULIC LINK – M200 STD, M100, M150
OPTION
1. Re-locate the pin at the frame linkage as
required to position the hook over the
header pin.
2. Activate HEADER TILT cylinder switches on
GSL to extend or retract center link cylinder
so that the hook lines up with the header
attachment pin.
3. Push down on rod end of link cylinder until
hook engages pin on header and is locked.
4. Check that center link is locked onto header
by pulling upward on rod end of cylinder.
5. Proceed to step e.
HYDRAULIC LINK WITH OPTIONAL SELF-
ALIGNMENT KIT
1. Adjust the position of the center link cylinder
with the REEL UP and REEL DOWN
switches, and HEADER TILT switches on
the GSL to position the hook above the
header attachment pin.
2. Lower the center link onto the header with
REEL DOWN switch, until it locks into
position (handle is down).
CAUTION
Check to be sure all bystanders have cleared
the area.
e. Start
engine.
f. Raise the header fully with the header up switch
on the GSL. Stop engine and remove key.
(continued next page)
HEADER TILT UP
HEADER
TILT DOWN
REEL UP
REEL DOWN
HEADER UP
HEADER TILT UP
HEADER DOWN
HEADER
TILT DOWN