
stabilizer/slow speed transport wheels
adjusting ........................................................... 43
start-up
daily checks........................................................ 32
steel tines
installing.......................................................... 226
removing ......................................................... 225
stubble height
adjusting inner skid shoes ..................................... 47
adjusting outer skid shoes .................................... 47
swath forming rods (center delivery)
options............................................................ 252
T
tension
definition........................................................... 19
TFFT
definition........................................................... 19
tines
reel tine pitch ..................................................... 63
reel tines
steel tines
installing ................................................... 226
removing .................................................. 225
tine tube bushings............................................. 229
tire inflation/pressures .......................................... 240
torque
definition........................................................... 19
torque angles
definition........................................................... 19
torque specifications ............................................. 268
axle bolts ......................................................... 239
metric bolt specifications.................................... 268
cast aluminum............................................... 270
O-ring boss hydraulic fittings
–
adjustable.............. 271
O-ring boss hydraulic fittings
–
non-adjustable ....... 272
O-ring face seal fittings ...................................... 273
tapered pipe thread fittings ................................ 274
torque-tension
definition........................................................... 19
tow-bars
attaching ......................................................... 108
removing ........................................................... 97
storing .............................................................. 98
towing the header ............................................. 95
attaching header to towing vehicle......................... 96
converting from field to transport ........................ 103
converting from transport to field .......................... 97
moving front (left) wheels to transport position ..... 103
moving front wheels (left) into field position............ 99
moving rear (right) wheels to field position............ 101
moving rear (right) wheels to transport position ..... 105
tow-bar ............................................................. 97
transport systems
axle bolt torque ................................................ 239
tire inflation/pressures....................................... 240
tow-bars
attaching ...................................................... 108
storing ........................................................... 98
wheel bolt torque ............................................. 238
transporting on windrower ...................................... 95
troubleshooting ................................................... 255
crop loss at cutterbar ......................................... 255
cutting action and knife components .................... 257
cutting edible beans .......................................... 263
header and drapers ........................................... 261
reel delivery ..................................................... 259
windrow formation ........................................... 266
U
U-joints
reel drive
installing ...................................................... 221
removing...................................................... 220
unloading and assembly ........................................ 276
upper cross augers........................................... 92, 253
installing beater bars ........................................... 93
removing beater bars........................................... 92
V
vertical knife mount kits ........................................ 248
W
washers
definition........................................................... 19
WCM
definition........................................................... 19
wheels and tires
tire inflation/pressures....................................... 240
wheel bolt torques ............................................ 238
windrowers
attaching to header ............................................. 25
controls ............................................................. 34
definition........................................................... 19
detaching from header......................................... 27
transporting header............................................. 95
windrows
chemical drying agents......................................... 84
curing ............................................................... 83
delivery opening ................................................. 75
double windrowing.............................................. 76
driving on .......................................................... 84
formation .......................................................... 84
haying tips ......................................................... 83
raking and tedding .............................................. 84
INDEX
Summary of Contents for D50
Page 101: ...169441 89 Revision D 10 Tighten bolts B OPERATION ...
Page 124: ......
Page 295: ...topsoil moisture 83 types 80 weather and topography 83 WOT definition 19 INDEX ...
Page 296: ......