
169441
30
Revision D
3.4
Break-in Period
Until you become familiar with the sound and feel of your new header, be extra attentive.
CAUTION
Before investigating an unusual sound or attempting to correct a problem, shut off engine and remove key.
After attaching the header to the windrower for the first time, follow these steps:
1.
Operate the machine with the reels, drapers, and knives running slowly for five minutes. Watch and listen
FROM THE
OPERATOR
’
S SEAT
for binding or interfering parts.
NOTE:
Reels and side drapers will not operate until oil flow fills the lines.
2.
Refer to
4.12.1 Break-in Inspection, page 241
and perform all the specified tasks.
Summary of Contents for D50
Page 101: ...169441 89 Revision D 10 Tighten bolts B OPERATION ...
Page 124: ......
Page 295: ...topsoil moisture 83 types 80 weather and topography 83 WOT definition 19 INDEX ...
Page 296: ......