
169441
94
Revision D
1001653
A
B
C
Figure 3.91: Beater Bars
3.
Position one beater bar (B) and one clamp set (C) onto the
auger tube and loosely secure with carriage bolt (A) and
nut. Bolt head
MUST
face the direction of auger rotation.
4.
Position the remaining clamp sets (C) onto the auger tube
and loosely attach to beater bar (B) with carriage bolts (A)
and nuts. Bolt heads
MUST
face the direction of
auger rotation.
5.
Position second beater bar (B) in clamp sets (C) and secure
with carriage bolts (A) and nuts.
NOTE:
To reduce the chance of wrapping, offset the beater
bars by 90°.
6.
Tighten the bolts.
1001652
A
B
C
Figure 3.92: Beater Bars
Summary of Contents for D50
Page 101: ...169441 89 Revision D 10 Tighten bolts B OPERATION ...
Page 124: ......
Page 295: ...topsoil moisture 83 types 80 weather and topography 83 WOT definition 19 INDEX ...
Page 296: ......