
169441
221
Revision D
1001325
A
B
C
Figure 4.201: U-Joint
8.
Remove six bolts (A) attaching U-joint flange (B) to driven
sprocket (C).
9.
Remove the U-joint.
NOTE:
It may be necessary to move the right reel sideways for the
U-joint to clear the tube.
Installing Double-Reel U-Joint
Once the old U-joint has been removed, a new one can be installed.
NOTE:
It may be necessary to move the right reel sideways for the U-joint to clear the reel tube.
1001325
A
B
C
Figure 4.202: U-Joint
1.
Position U-joint flange (B) onto driven sprocket (C) as
shown. Install six bolts (A) and hand-tighten them.
NOTE:
Do
NOT
torque the bolts.
1001322
A
B
Figure 4.203: U-Joint
2.
Position the right reel tube against the reel drive and
engage the stub shaft into the U-joint pilot hole.
3.
Rotate the reel until the holes in the end of the reel tube
and U-joint flange (B) line up.
4.
Install four bolts (A).
5.
Torque the bolts to 95
–
108 Nm (70
–
80 lbf
∙
ft).
Summary of Contents for D50
Page 101: ...169441 89 Revision D 10 Tighten bolts B OPERATION ...
Page 124: ......
Page 295: ...topsoil moisture 83 types 80 weather and topography 83 WOT definition 19 INDEX ...
Page 296: ......