PRE-DELIVERY INSPECTION
Form 169007
43
Revision
D
NOTE
U-joint has an extended lubrication cross and
bearing kit. Stop greasing when greasing
becomes difficult, or if U-joint stops taking
grease. Over-greasing will damage U-joint.
6 to 8 pumps are sufficient at first grease
(factory). Decrease grease interval as U-joint
wears, and requires more than 6 pumps.
(continued next page)
REEL SHAFT RH BEARING (1 PLC)
D60
REEL SHAFT LH BEARING (1 PLC)
NOTE
To prevent binding and/or excessive
wear caused by sickle pressing on
guards, do not over-grease. If more
than 6 to 8 pumps of the grease gun
are required to fill the cavity, replace
the seal in the sickle head.
SICKLE HEAD
(1 PLC SINGLE KNIFE / 2 PLCS DOUBLE KNIFE)
High Temperature
Extreme Pressure (EP2)
Performance With
1% Max Molybdenum
Disulphide
(NLGI Grade 2)
Lithium Base.
REEL UNIVERSAL (1 PLC) DOUBLE REEL
REEL CENTER BEARING (1 PLC)
DOUBLE REEL ONLY