PRE-DELIVERY INSPECTION
Form 169007
35
Revision
D
STEP 16. PRE-DELIVERY
INSPECTION
IMPORTANT
To avoid machine damage, check that
no shipping dunnage has fallen into
machine.
Perform the final checks as listed on the "Pre-
Delivery Checklist" (yellow sheet attached to this
instruction) to ensure the machine is field-ready.
Refer to the following pages for detailed
instructions as indicated on the checklist.
IMPORTANT
The machine has been set at the
factory, and should require no further
adjustments.
However, perform the following checks
to ensure your machine will provide
maximum performance. Adjustments
should be made
only if absolutely
necessary,
and in accordance with
the instructions in this manual.
The completed checklist should be retained either
by the Operator or the Dealer.
A. TIRE PRESSURE (TRANSPORT AND
STABILIZER WHEEL OPTIONS)
Check tire inflation pressure.
If necessary, inflate as per following table.
YEAR TIRE SIZE
PRESSURE
2006 and
EARLIER
GOODYEAR
WRANGLER
RT/S
205-75
R15
40 psi
(276 kPa)
2007 and
LATER
CARLISLE
and TITAN
ST205/75
R15
65 psi
(448 kPa)
IMPORTANT
Do not exceed maximum pressure
specified on tire side wall.
B. WHEEL BOLT TORQUE
(TRANSPORT AND STABILIZER
WHEEL OPTIONS)
Check wheel bolt torque is 80 - 90 ft·lbf
(110 - 120 N·m).
Refer to bolt tightening sequence illustration
above.
C. WOBBLE BOX
a. Position of plug (A) and breather (B) at wobble
box must be as shown.
b. Check oil level.
(continued next page)
1
2
3
4
5
6
CHECK OIL LEVEL WITH TOP OF
WOBBLE BOX HORIZONTAL
BETWEEN LOWER HOLE
AND END OF DIPSTICK
A
B