
Programming Guide
57
Replacing the Bus Supply
In the unlikely event the EcoSystem bus should fail, a newly installed
bus supply can “learn” the settings of the system by downloading it
from the ballasts. This also clears any existing programming in the
bus supply.
1
1 Make sure the new bus supply
has been properly installed,
but do not perform any
programming steps.
2
2 From the Main Menu, tap
S
Syys
stte
em
m then R
Re
ep
plla
ac
ce
e B
Bu
us
s
S
Su
up
pp
pllyy.
3
3 Read the instructions. Point
the programmer at any IR
control device, then tap
to
continue.
4
4 Read the caution, then tap
to begin the replacement
procedure.
5
5 If all ballasts flash and go to
their high level, tap
.
6
6 Once all ballasts go to their
minimum level and then flash,
tap
.
2
2