Safety
OPERATION SETUP
1� Be sure the load bearing surface is strong enough to support the machine with lifted load�
2� Be sure the crane is level� Check frequently and re-level when necessary�
3� Stay away from rotating cranes� Erect barricades to keep people away� Make sure these areas are
clear before swinging� WARNING-INJURY CAN OCCUR!
POWER LINE SAFETY
1� Determine whether there are power lines in the area before starting any job� Only operate around
power lines in accordance with Federal, State and Local Regulations as well as ASME B30�5
(latest edition)�
2� Never remove materials from under powerlines with a crane if the boom or machine is capable of
contacting them�
3� No part of the crane or the load should contact, or violate the minimum allowable clearance required
for operation of the crane near electrical lines�
(Continued on next page ���)
Summary of Contents for 35-127 M
Page 1: ...OPERATORS MANUAL LOAD KING 35 127 M C1046093 REV A FEBRUARY 09 2022...
Page 2: ...PAGE INTENTIONALLY LEFT BLANK...
Page 48: ...PAGE INTENTIONALLY LEFT BLANK...
Page 63: ...63 Description Of Machine and Controls Operator Controls 5 3 2 4 8 7 1 9 10 6...
Page 79: ...79 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 96: ...PAGE INTENTIONALLY LEFT BLANK...
Page 124: ...PAGE INTENTIONALLY LEFT BLANK...
Page 131: ...131 35 127 M Master Lube Chart 1 2 5 11 12 3 4 6 8 9 7...
Page 132: ...132 35 127 M Maintenance...
Page 150: ...150 35 127 M Maintenance...
Page 172: ...PAGE INTENTIONALLY BLANK...
Page 176: ...PAGE INTENTIONALLY LEFT BLANK...
Page 201: ...201 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 202: ...PAGE INTENTIONALLY LEFT BLANK...
Page 209: ...209 Torque Specs SAE Metric...
Page 210: ...210 35 127 M Appendix...
Page 212: ...PAGE INTENTIONALLY LEFT BLANK...
Page 213: ...Notes...
Page 216: ...35 127 M Operator Manual...