49
Assembly
Wire Rope Reeving
Reeving diagram for the main hoist line are shown� The number of parts of line used will depend on the
load to be lifted� Refer to the maximum load chart located on riding seat for the required reeving� Hoisting
and lowering speeds will be reduced as the number of parts of line increase�
BOOM CONNECTION FOR EVEN PARTS OF LINE
1 Boom Head
3 Dead End Socket
2 Dead End Link
Summary of Contents for 35-127 M
Page 1: ...OPERATORS MANUAL LOAD KING 35 127 M C1046093 REV A FEBRUARY 09 2022...
Page 2: ...PAGE INTENTIONALLY LEFT BLANK...
Page 48: ...PAGE INTENTIONALLY LEFT BLANK...
Page 63: ...63 Description Of Machine and Controls Operator Controls 5 3 2 4 8 7 1 9 10 6...
Page 79: ...79 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 96: ...PAGE INTENTIONALLY LEFT BLANK...
Page 124: ...PAGE INTENTIONALLY LEFT BLANK...
Page 131: ...131 35 127 M Master Lube Chart 1 2 5 11 12 3 4 6 8 9 7...
Page 132: ...132 35 127 M Maintenance...
Page 150: ...150 35 127 M Maintenance...
Page 172: ...PAGE INTENTIONALLY BLANK...
Page 176: ...PAGE INTENTIONALLY LEFT BLANK...
Page 201: ...201 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 202: ...PAGE INTENTIONALLY LEFT BLANK...
Page 209: ...209 Torque Specs SAE Metric...
Page 210: ...210 35 127 M Appendix...
Page 212: ...PAGE INTENTIONALLY LEFT BLANK...
Page 213: ...Notes...
Page 216: ...35 127 M Operator Manual...