
181
PROCEDURE FOR ADJUSTING BOOM VALVE ADJUSTMENTS
The system reliefs should be set only when the oil in the hydraulic system is warm or at operating
temperature�
1
2
3
BOOM VALVE
CROSS PORT RELIEF
1 LS port
4 Retract boom - Cross port relief (B)
2 Extend boom - Cross port relief (A)
1� Install gauge in LS port (
1
) on boom valve (Mid section of boom/swing valve)�
2� Engine at full throttle (Approx 1650 rpm depending on chassis)�
3� Fully Extend boom - Set Cross port relief (
2
) to 2700 psi
4� Fully Retract boom - Set cross port relief (
3
) to 2250 psi�
5� Fully raise or lower boom and set boom valve relief to 3500 psi�
Summary of Contents for 35-127 M
Page 1: ...OPERATORS MANUAL LOAD KING 35 127 M C1046093 REV A FEBRUARY 09 2022...
Page 2: ...PAGE INTENTIONALLY LEFT BLANK...
Page 48: ...PAGE INTENTIONALLY LEFT BLANK...
Page 63: ...63 Description Of Machine and Controls Operator Controls 5 3 2 4 8 7 1 9 10 6...
Page 79: ...79 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 96: ...PAGE INTENTIONALLY LEFT BLANK...
Page 124: ...PAGE INTENTIONALLY LEFT BLANK...
Page 131: ...131 35 127 M Master Lube Chart 1 2 5 11 12 3 4 6 8 9 7...
Page 132: ...132 35 127 M Maintenance...
Page 150: ...150 35 127 M Maintenance...
Page 172: ...PAGE INTENTIONALLY BLANK...
Page 176: ...PAGE INTENTIONALLY LEFT BLANK...
Page 201: ...201 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 202: ...PAGE INTENTIONALLY LEFT BLANK...
Page 209: ...209 Torque Specs SAE Metric...
Page 210: ...210 35 127 M Appendix...
Page 212: ...PAGE INTENTIONALLY LEFT BLANK...
Page 213: ...Notes...
Page 216: ...35 127 M Operator Manual...