55
10� DO NOT REMOVE PIN SECURING JIB TO THE BOOM, AT JIB STOW BRACKET
UNTIL STEP 7 HAS BEEN PERFORMED, OTHERWISE JIB WILL FALL OFF THE
BOOM CAUSING SERIOUS INJURY TO PERSONNEL AND PROPERTY
DAMAGE�
Arrow shows location of jib pin in stow bracket
Confirm jib is pinned to boom head and then remove pin from jib pin stow bracket on boom�
Do not remove pins until Step 7 has been completed.
11� Extend the boom approximately 15 inches so the jib stow bar is clear of the front jib stow bracket
at the boom head�
Arrow indicates location of Stow Bracket
Summary of Contents for 35-127 M
Page 1: ...OPERATORS MANUAL LOAD KING 35 127 M C1046093 REV A FEBRUARY 09 2022...
Page 2: ...PAGE INTENTIONALLY LEFT BLANK...
Page 48: ...PAGE INTENTIONALLY LEFT BLANK...
Page 63: ...63 Description Of Machine and Controls Operator Controls 5 3 2 4 8 7 1 9 10 6...
Page 79: ...79 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 96: ...PAGE INTENTIONALLY LEFT BLANK...
Page 124: ...PAGE INTENTIONALLY LEFT BLANK...
Page 131: ...131 35 127 M Master Lube Chart 1 2 5 11 12 3 4 6 8 9 7...
Page 132: ...132 35 127 M Maintenance...
Page 150: ...150 35 127 M Maintenance...
Page 172: ...PAGE INTENTIONALLY BLANK...
Page 176: ...PAGE INTENTIONALLY LEFT BLANK...
Page 201: ...201 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 202: ...PAGE INTENTIONALLY LEFT BLANK...
Page 209: ...209 Torque Specs SAE Metric...
Page 210: ...210 35 127 M Appendix...
Page 212: ...PAGE INTENTIONALLY LEFT BLANK...
Page 213: ...Notes...
Page 216: ...35 127 M Operator Manual...