54
35-127 M
Assembly
NOTE:
If any force is required to install any of the four jib pins, it should not be more than a few hits
from a machine hammer.
8� Raise boom to horizontal position�
JIB WILL SWING UNCONTROLLED IF BOOM IS NOT HORIZONTAL� THERE IS A
DANGER OF BODILY HARM IF THE JIB IS NOT PROPERLY CONTROLLED�
9� Fasten a tag line, approximately 15 feet long, to the anchor point at the end of the jib�
Summary of Contents for 35-127 M
Page 1: ...OPERATORS MANUAL LOAD KING 35 127 M C1046093 REV A FEBRUARY 09 2022...
Page 2: ...PAGE INTENTIONALLY LEFT BLANK...
Page 48: ...PAGE INTENTIONALLY LEFT BLANK...
Page 63: ...63 Description Of Machine and Controls Operator Controls 5 3 2 4 8 7 1 9 10 6...
Page 79: ...79 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 96: ...PAGE INTENTIONALLY LEFT BLANK...
Page 124: ...PAGE INTENTIONALLY LEFT BLANK...
Page 131: ...131 35 127 M Master Lube Chart 1 2 5 11 12 3 4 6 8 9 7...
Page 132: ...132 35 127 M Maintenance...
Page 150: ...150 35 127 M Maintenance...
Page 172: ...PAGE INTENTIONALLY BLANK...
Page 176: ...PAGE INTENTIONALLY LEFT BLANK...
Page 201: ...201 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 202: ...PAGE INTENTIONALLY LEFT BLANK...
Page 209: ...209 Torque Specs SAE Metric...
Page 210: ...210 35 127 M Appendix...
Page 212: ...PAGE INTENTIONALLY LEFT BLANK...
Page 213: ...Notes...
Page 216: ...35 127 M Operator Manual...