
61
9� Remove ball or block from wire rope�
10� Winch out enough cable to reach over the sheave of the jib�
11� Place wire rope over boom head sheave� If machine is equipped with a sheave retaining bracket,
make sure the bracket slot is aligned with guide pin so it is held upright� Install guide pin and
retainer�
Summary of Contents for 35-127 M
Page 1: ...OPERATORS MANUAL LOAD KING 35 127 M C1046093 REV A FEBRUARY 09 2022...
Page 2: ...PAGE INTENTIONALLY LEFT BLANK...
Page 48: ...PAGE INTENTIONALLY LEFT BLANK...
Page 63: ...63 Description Of Machine and Controls Operator Controls 5 3 2 4 8 7 1 9 10 6...
Page 79: ...79 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 96: ...PAGE INTENTIONALLY LEFT BLANK...
Page 124: ...PAGE INTENTIONALLY LEFT BLANK...
Page 131: ...131 35 127 M Master Lube Chart 1 2 5 11 12 3 4 6 8 9 7...
Page 132: ...132 35 127 M Maintenance...
Page 150: ...150 35 127 M Maintenance...
Page 172: ...PAGE INTENTIONALLY BLANK...
Page 176: ...PAGE INTENTIONALLY LEFT BLANK...
Page 201: ...201 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 202: ...PAGE INTENTIONALLY LEFT BLANK...
Page 209: ...209 Torque Specs SAE Metric...
Page 210: ...210 35 127 M Appendix...
Page 212: ...PAGE INTENTIONALLY LEFT BLANK...
Page 213: ...Notes...
Page 216: ...35 127 M Operator Manual...