Chapter 3 SETTING INTO OPERATION
3 - 5
GT 112-E
3.3 MOUNTING
3.3.1 Leveling
Attention: Prior to leveling and anchoring the bar feeder the lathe must be
leveled
1. Place the leveling pads (A) under each stands.
2. On each leg, loosen the lock nuts (B) of the leveling screws (C). Then, make sure that the
weight of the bar feed system is evenly distributed over the 12 support points.
3. Turn the screws (C) until they evenly touch the pads with an equal pressure on each pad.
4. Using a bubble level indicator level the bar feeder using the adjusting the leveling screws (C).
5. Loosen the lock nuts (D) and make sure that the central screws (E) of the front and rear feet
are supported. Loosen all locking screws (F).
6. Adjusting the central screws (E), set the height of the bar feed system. Normally, when the
reference point is known, this adjustment is approximately set at the factory.
7. Together with the vertical alignment, proceed with the lateral alignment, by shifting the
apparatus. Always maintain even pressure from the leveling screws to each leveling pad.
8. When the alignment is satisfactory, tighten all locking screws (F) and nuts (D). Check the
alignment and, if necessary, make the fine adjustment with the screws (C).
9. Anchor the bar feeder to the floor using anchoring bolts(G) and according to instructions in
the manual (3.3.3.)
10. Prior to securing the bar feeder to the floor it is recommended to check again the bar feeder
alignment. The bar feeder alignment is critical for good performance.
A
D
B
C
E
F
G
Summary of Contents for GT 112-E
Page 7: ...1 4 Chapter 1 BASIC NOTIONS GT 112 E...
Page 10: ...Chapter 2 TECHNICAL DATA 2 3 GT 112 E 2 4 FLOOR PLAN LtoRF Bar Feeder...
Page 11: ...2 4 Chapter 2 TECHNICAL DATA GT 112 E RtoLF Bar Feeder...
Page 13: ...2 6 Chapter 2 TECHNICAL DATA GT 112 E...
Page 21: ...3 8 Chapter 3 SETTING INTO OPERATION GT 112 E...
Page 32: ...Chapter 4 ELECTRICS 4 11 GT 112 E 4 4 PLC I O Circuit diagram XM1 25 A001G...
Page 33: ...4 12 Chapter 4 ELECTRICS GT 112 E 4 5 DIAGRAMS 4 5 1 AC circuit Circuit diagram XM1 25 A001G...
Page 34: ...Chapter 4 ELECTRICS 4 13 GT 112 E 4 5 2 Emergency stop circuit Circuit diagram XM1 25 A001G...
Page 35: ...4 14 Chapter 4 ELECTRICS GT 112 E Circuit diagram XM1 25 A001G...
Page 36: ...Chapter 4 ELECTRICS 4 15 GT 112 E Circuit diagram XM1 25 A001G Option...
Page 38: ...Chapter 4 ELECTRICS 4 17 GT 112 E Interface diagram BXA00001...
Page 48: ...Chapter 5 PNEUMATICS 5 7 GT 112 E 5 5 PNEUMATIC DIAGRAMS Pneumatic diagrams XM1 27 P003A...
Page 49: ...5 8 Chapter 5 PNEUMATICS GT 112 E Pneumatic diagrams XM1 27 P003A...
Page 50: ...Chapter 5 PNEUMATICS 5 9 GT 112 E Pneumatic diagrams XM1 27 P003A...
Page 51: ...5 10 Chapter 5 PNEUMATICS GT 112 E...
Page 75: ...7 20 Chapter 7 GENERAL DESCRIPTION GT 112 E...
Page 110: ...Chapter 8 OPERATION 8 35 GT 112 E 1 Start loading signal A3 2 Push signal A4...
Page 111: ...8 36 Chapter 8 OPERATION GT 112 E...
Page 114: ...Chapter 8 OPERATION 8 39 GT 112 E...
Page 150: ...9 36 Chapter 9 TROUBLE SHOOTING GUIDE GT 112 E...
Page 153: ...Chapter 10 APPENDICES 10 3 GT 112 E APPENDIX C ADDRESS LNS LNS Japan www lns japan com...
Page 154: ...10 4 Chapter 10 APPENDICES GT 112 E...
Page 155: ...XM1 00 A501B GT 112 E A 1...