54
LMC service schedule
1.
Visual inspection inside and outside
1.1
Wheel arches
1.2
Connection of floor platform and rear panel
1.2.1 Connection of floor platform and left-hand side panel
1.2.2 Connection of floor platform and right-hand side panel
1.3
Connection of floor platform and front panel
1.4
Connection of rear panel and left-hand side panel
1.4.1 Connection of rear panel and right-hand side panel
1.5
Connection of front panel and left-hand side panel
1.5.1 Connection of front panel and right-hand side panel
1.6
Connection of body and driver’s cab
1.7
Connection of roof and rear panel
1.7.1 Connection of roof and left-hand side panel
1.7.2 Connection of roof and right-hand side panel
1.7.3 Connection of roof and front panel
2.
Measurements
2.1
Measurements of the floor platform at these connection points with
dampness measurement device and entry of the values obtained.
Dampness values of up to 20% are normal.*
2.2
Measurements in the inner compartment of the vehicle at the specified
connection points and around the window and roof openings.
Dampness values of up to 20% are normal.*
3.
Spraying with special sealing compound
3.1 Wheel
arches
3.2
Cutout edges in the floor platform
3.3
Plate joints
We reserve the right to change the service schedule
* If values are over 20%, check that it is not the result of condensation.