Section 2. Initial assembly
In the eddy covariance system enclosure (7900-050), install the Power Distribution
Kit (7900-235) on the raised DIN rail. Connect the red wire lead between the top of
the breaker and top right red terminal. Install one shorting block to connect all
black terminals and another to connect all red terminals.
Figure 2-1. The power distribution kit (7900-235) installed in the enclosure (7900-050).
2-2
AirLink Cellular Communication
Summary of Contents for AirLink RV50X
Page 2: ......
Page 6: ...iv ...
Page 10: ...viii ...
Page 14: ...Section 1 Introduction to the communication system 1 4 AirLink Cellular Communication ...
Page 28: ...Section 2 Initial assembly 2 10 AirLink Cellular Communication ...
Page 36: ...Section 3 Configuring instrument IP addresses 3 8 AirLink Cellular Communication ...
Page 52: ...Section 4 Configuring the RV50X 4 16 AirLink Cellular Communication ...
Page 66: ...Section 6 Troubleshooting 6 4 AirLink Cellular Communication ...
Page 68: ...Section 7 Maintenance 7 2 AirLink Cellular Communication ...
Page 89: ......