Installation
25
GA 05.141/6.02 - 07/2003
Fig. 16 Connection elements, installing the splinter guard and fixing the intake flange for the MAG W 830 C
Forevacuum flange
Purge gas in
Intake flange
DRIVE/BEARING
connection
PK
connection
Cooling water
connection
Correct
Wrong
35 mm
17 mm
8 bolts M10 x 35
Installation torque per bolt: 35
+5
Nm
Bolt quality:12.9 according to DIN 898 with coating
0,2% yield strength > 1080 N/mm
2
Max. pump torque 30 kNm
MAG W 830 C
Caution
Install the splinter guard as shown.
Installing the splinter guard upside
down may lead to contact between
splinter guard and rotor during fast
venting of the pump.