49
(6)
Description of each stage of
Commissioning Cycle
progress:
Description of each stage of
Commissioning Cycle
progress
——
Cycle
code
Progress
code
Status code
Meaning
progress
LED1
LED2
LED3
Code Display
status code
Display
status Code
Display
status
01_Set up
master
ODU
db
light
01
light
A0
light System is not
Commissioned
db
light
01
light
CC
light System doesn’t have master unit.
Reset master unit.
db
light
01
light
CF
light More than 2 master units are set.
Reset master unit.
db
light
01
light
OC
light Master unit is successfully set.
Start next
step
.
02_Allocate
IDU
addresses
db
light
02
light
Ad
blink System is allocating addresses.
db
light
02
light
L7
blink
Master IDU is not set. Please set master IDU.
If it’s not set in 1min, system will set the
master IDU
automatically
.
db
light
02
light
OC
light Allocation is finished. Start next
step
.
03_Confirm
the quantity of
ODU's
db
light
03
light 01~0
4
blink LED3 displays the quantity of modules.
Confirm the number manually.
db
light
03
light
OC
light System has confirmed the quantity of
modules. Start next
step
.
04_Confirm
the quantity of
IDU
'
s
db
light
04
light 01~8
0
blink LED3 displays the quantity of IDUs.
Confirm the number manually.
db
light
04
light
OC
light System has confirmed the quantity of IDUs.
Start next
step
.
05_
Check
internal
ODU
commu
-
n
ication
issues
db
light
05
light
C2
light
System detects “driven communication error
between master unit and inverter
compressor”.
db
light
05
light
C3
light System detects “driven communication error
between master unit and inverter fan”.
db
light
05
light
CH
light IDU/ODU “
Diversity exceeds 135%"
db
light
05
light
CL
light IDU/ODU “
Diversity lower than 50%"
db
light
05
light
OC
light Detection is finished. Start next
step
.
06_
Check
outdoor
components
db
light
06
light Error
code light System detects error in outdoor components.
db
light
06
light
OC
light No error in outdoor components.
Start next
step
.
07_
Check
indoor
components
db
light
07
light
XXXX
/Error
code
light
System detects error in indoor components.
XXXX is the project no. of the faulted IDU.
After
3s, relevant error code is displayed.
For example, IDU no. 100 has d5 error, then
LED3 displays like this: 01 (2s later) 00 (2s
later) d5, and repeat again.
Lennox
VRF Unit