7
2014+ XL Raider
1.
See Fig. 1
. Install master cylinder bracket to
motorcycle frame using the following hardware.
Use Loctite 242 and
Torque to 20 ft. lbs.
At-
tach OEM brake line and clamp to LH side as
shown.
•
(1) Master Cylinder Bracket– S002187
•
(2) 5/16” Hex Head Bolt GR8– CB1161
•
(2) 5/16” Flat Washers– CW2010
2.
See Fig. 2
. Install master cylinder to bracket
using the following hardware. Use Loctite 242
and
Torque to 35 ft. lbs.
•
(1) Master Cylinder– GB6210
•
(1) 3/4” Nut– CN3255
3. Screw long end of link rod with 5/16” thin jam
nut into master cylinder. Place 5/16” lock
washer on short end and screw it into HD
pushrod.
•
(1) Link Rod– LR6400
•
(1) 5/16” Thin Jam Nut– CN3012
•
(1) 5/16” Lock Washer– CW2045
4. Extend rod to raise pedal height to top. Lock
jam nuts into place.
5. Test full stroke of master cylinder and check for
binding.
6.
See Fig. 3
. Attach OEM brake line to master
cylinder using the following hardware.
Torque
banjo bolt to 16 ft. lbs.
•
(2) Banjo Washers- GC6002
•
(1) Banjo Bolt– CB1697
MASTER CYLINDER INSTALLATION
Attach bracket to frame
Fig. 1
Fig. 2
3/4” nut
Link rod
Jam nut
Lock
washer
Install Line
Fig. 3