![background image](http://html1.mh-extra.com/html/launch/cch201/cch201_user-manual_3854031033.webp)
SPRAY BOOTH USER MANUAL
- 31 -
4.3.1 Painting station
After having cleaned and prepared the vehicle, the operations functions for the painting phase
as following steps.
1.Turn on the key switch to open the power supper,and press the light switch to turn on the
lights
2. Drive the vehicle into be spray,and close the main door.
3. Check the setting value of temperature meter and dring timer,normally the value had been setted by the
manufacture.And the dring temperature should be 60
℃
and the dring time should be about 30
~
45minutes.
4.Check the shuff of the damper is in the right position
5. Press the motor button to open exhaust ,you can see the indictor of the motor turn on,and the intake
fan will start about 10 seconds later.
6.The worker get into the booth through the safety door and do the painting.If the temperature is low,turn
the dring/painting switch to left and open the burner and rise the paiting temperature(during the heating
painting system the burner will stop automatic when the temperature rise to 25
℃
,and when the
temperature go down to about 20
℃
,the burner will start again).
7.The worker get out from the booth throuth the safety door when finish the painting.Then change to
baking station.
4.3.2 Drying station
The operations to follow in the drying process phase are:
1. Make sure that all the spray painting functions are ended and that the operator has gone out of the
spray painting environment.
2. Check there is enough diesel oil in the oil tank and no leaking of the oil pipe.
3. Check the setting value of temperature meter and dring timer,normally the value had been setted by the
manufacture.And the dring temperature should be 60
℃
and the dring time should be about 30
~
45minutes.
4.Turn the dring/painting switch to right to open the burner.At the same time the damper will turn to
another position and the light will turn off automatic.And the exhaust fan will turn off,but the intake fan is
keeping operation.
5.The spray booth will be working automatic till the setting dring time finished.
6.When the setting dring time is finished,the burner will stop automatic first,then the motor will stop about
5 minutes later.
7.The light will be turn on again after the motor stopping.
Attention: Don’t do any setting for the temperature meter.We have resetted all the data
for the program.The setting you can do is only setting the drying temperature(Default
data is 60
℃
) and the drying time(Default data is 30minutes)