![background image](http://html1.mh-extra.com/html/launch/cch201/cch201_user-manual_3854031017.webp)
SPRAY BOOTH USER MANUAL
- 15 -
3.3 Installation Methods and Steps
3.3.1 Basement installation
The basement installed step shown as the following step(shown in Fig.3.3)
Fig. 3.3
1. Put the metal board(front,back,sides)and middle bracket in the right place,and connect them with bolt
M8*20 according to the demand of the installation chart.then screw down.Shown in Fig.3.4.
Fig. 3.4