![background image](http://html1.mh-extra.com/html/launch/cch201/cch201_user-manual_3854031019.webp)
SPRAY BOOTH USER MANUAL
- 17 -
Fig. 3.6
3) Take the Front door frame on to the front panel of the basemenet by two workers,then one workers
hold the door frame and another worker take the safe door and one wall panel on aother side,connect
them to the door frame with nails . At last take four bolt M8*20 to connect the bottom of the door frame
and the front panel of the basement. shown in Fig.3.7. So the door frame can be stand steadily.
Fig. 3.7
2. Wall panel installation
1) connect the wall board in turn and fix the to the down U style slot with nail,make sure the gap should be
smallest.Check the whole length of two sides wall board should be suit for the demand.(shown in Fig3.8)