![background image](http://html1.mh-extra.com/html/launch/cch201/cch201_user-manual_3854031030.webp)
SPRAY BOOTH USER MANUAL
- 28 -
2) Wire connection
The main component have been connected before delivery,the connection to the control box. you should
do as follow in Fig.3.29:
Connect the power supply into the control box and conect the control box to the burner,motor,light and
control damper with electric wires according to the electrical chart we offer.
Fig. 3.29
Attention: You must connect the motor wire according to the electrical chart offered.And
you must be attention to the start method of the motor,Generally our spray booth have
two start methods: motor direct start connection and Y
/△ start connection.When
you choose the direct start of motor ,The Up and Down ports of the motor should
be connected with the metal pad,and then connect three ports (Up or Down) to the
control box shown in fig.2.30.When choose
Y
/△ start connection,you must take
the metal pad out,and connect to the six connection ports in the motor.
Fig. 3.30