SPRAY BOOTH USER MANUAL
- 18 -
Fig. 3.8
2) Installate the edges inside and outside.(shown in Fig.3.9)
3) Installate the cover of the wall panel(shown in Fig.3.9)
4
)
Air enter connector installation
The air enter connector is necessay between the top frame of generator and air cabin.(shown in
Fig.3.9). Install the cover of the shorten panel,then connect to zinc panpel with nail and do
some sealing.
Fig. 3.25
4. Main door installation
Installate the door,including the lock,hinge,handle,plastic sealing bar and so on.
(
shown in Fig.3.10
)