Ventilation Requirements
4.1.4
There is an enclosure breather fitted to the BIOGAS 3000 situated at the base
of the enclosure (see annotation 13 on
Figure 3 - BIOGAS 3000 customer
). It is the user’s responsibility to ensure that there is a free
circulation of air around the cabinet.
Warning
If the system is being installed indoors, it is our
recommendation that a suitable gas leak detector is
placed nearby to the system to inform operators of a
leak before entering the room. This is not supplied by
LANDTEC or QED.
4.2
External Customer Connections
The installation will require the operator to connect a mains cable, output
cable, drain and gas pipes to the equipment.
Figure 3 - BIOGAS 3000 customer
identifies the available connection points on the BIOGAS 3000:
Figure 3 - BIOGAS 3000 customer connections
1) Customer cable entry – mains supply 8)
Drain
2) Customer cable entry – not used
9)
Vent to Atmosphere
3) Customer cable entry – data outputs
10) Sample Gas 4
4) Sample Gas 1
11) Sample Gas 2
5) Sample Gas 3
12) Customer cable entry – relays
6) Air In
13) Breather Drain
7) Process Return