
Operating Manual
155
© Copyright 2016
OMBG3000 – Rev1
7.6.4.3
BG3K3
With hydrolysis option:
Apply
pressure to:
Solenoid
1
Solenoid
2
Solenoid
3
Solenoid
5
Solenoid
6
Air Purge
OFF
OFF
OFF
ON
OFF
Sample Gas 1
OFF
OFF
OFF
OFF
OFF
Sample Gas 2
OFF
OFF
OFF
OFF
OFF
Sample Gas 3
OFF
OFF
ON
OFF
ON
Note: Ensure the ball valves on the ‘Process Return’ and ‘Vent to
Atmosphere’ lines are opened once testing is completed.
Note: When reattaching the sample pipes to the system, ensure all tube
connections are tight and free from leaks.
Note: If assistance is required, please contact our technical support team
at (800) 968-2026 or email