3
4. CONVERTING FROM BUILT-IN SYRUP PUMPT TO REMOTE PUMPS OR
SYRUP TANKS............................................................................................................................23
4.1 REMOVING EXISTING BUILT-IN SYRUP PUMPS............................................................23
4.2 INSTALLING REMOTE PUMP OR SYRUP TANKS............................................................23
5. TROUBLESHOOTING...........................................................................................................24-31
6. TROUBLESHOOTING THE LANCER ELECTRONIC ICE BANK CONTROL (EIBC)...............32
6.1 CHECKING FOR NORMAL PCB OPERATION..................................................................32
7. ILLUSTRATIONS, PARTS LISTINGS, WIRING DIAGRAMS, AND
PLUMBING DIAGRAMS.............................................................................................................34
7.1 REFRIGERATION DECK ASSEMBLY...........................................................................34-35
7.2 STANDARD CABINET ASSEMBLY...............................................................................36-37
7.3 SHROUDED CABINET ASSEMBLY..............................................................................38-39
7.4 CARBONATOR, WATER/SYRUP LINE ASSEMBLIES.................................................40-41
7.5 CARBONATOR DECK/PUMP BRACKET ASSEMBLIES..............................................42-43
7.6 CONTROL HOUSING.........................................................................................................44
7.7 WATER REGULATOR ASSEMBLY.....................................................................................45
7.8 WIRING DIAGRAM.............................................................................................................46
8. DISPENSER DISPOSAL.............................................................................................................47
Summary of Contents for 9000 series
Page 33: ...NOTES 33...