1. INSTALLATION
1.1 UNPACKING
A. Cut steel band and remove.
B. Remove top portion of carton by lifting up.
C. Remove accessory kit and loose parts from top packaging.
D. Remove top inner carton pad and corners.
E. Lift unit up by plywood shipping base and remove lower portion of carton.
F. Inspect unit for concealed damage. If evident, notify delivering carrier and file a claim against
the carrier.
G. Remove plywood shipping base from unit by moving unit so that one side is off the counter top
or table allowing access to screws on the bottom of the plywood shipping base.
NOTE:
If unit is to be transported, it is advisable to leave the unit secured to the plywood base.
H. If unit is to be installed with optional legs, assemble legs to unit by tilting unit.
DO NOT LAY
UNIT ON ITS SIDE OR BACK.
1.2 UNPACKING INSTALLATION KITS
A. Inspect kits for concealed damage and if evident, notify delivering carrier and file a claim
against same.
B. Each kit contains a list of the parts and a drawing showing the proper assembly of the parts.
1.3 SELECTING A COUNTER LOCATION
A. Select a location close to a properly grounded electrical outlet and water supply that meet the
requirements as shown in the section, SPECIFICATIONS.
10
!
WARNING
FAILURE TO MAINTAIN SPECIFIED CLEARANCE WILL CAUSE THE COMPRESSOR TO OVERHEAT
AND WILL RESULT IN COMPRESSOR FAILURE.
ADVERTENCIA
SI NO DEJA EL ESPACIO LIBRE ESPECIFICADO EL COMPRESOR PUEDE RECALENTAR Y
FALLAR.
AVERTISSEMENT
LE FAIT DE NE PAS MAINTENIR LE DÉGAGEMENT SPÉCIFIÉ FERA SURCHAUFFER LE
COMPRESSEUR ET AURA COMME CONSÉQUENCE UNE DÉFAILLANCE DU COMPRESSEUR.
B. Condenser air is drawn in from the front half of the top cover, and discharged out the rear half
of the top cover. A minimum of eight (8) inches (203 mm) clearance must be maintained over
the top of the unit to provide for proper air flow and air circulation.
1.4 INSTALLING THE DISPENSER
A. The dispenser is designed to be installed either permanently installed or placed on a counter
using the four (4) inch legs (included in the Lancer kit, PN 82-1704).
NOTE:
NSF listed units must be sealed to the counter or have four (4) inch legs installed.
B. When the dispenser is to be permanently bolted to the counter top, the dispenser base must be
sealed to the counter top with a bead of clear silicone caulk or sealant which provides a smooth
and easily cleanable bond to the counter.
C. For installation using the unit legs, use Lancer kit (PN 82-1704).
1.5 LEVELING THE DISPENSER
In order to facilitate proper dispenser drainage and
carbonation, ensure that the dispenser is level, front to back
and side to side. Place a level on the top of the rear edge
of the dispenser. The bubble must settle between the level
lines. Repeat this procedure for the remaining three sides.
Level unit if necessary. For optimum performance place the
unit at a 0 degree tilt. The maximum tilt is 5 degrees.
1.6 CONNECTING THE DRAIN
A. Remove cup rest. Lift splash plate up and pull out and down on the bottom to remove.
B. Remove the drip tray from the unit and connect the drain tube to the drain fitting located on the
back.
C. Route the drain tube to a suitable drain and replace the unit’s drip tray.