
Mobile Dust Cyclone Manual
37
7.
Install the new Mounting Plate (with new Circuit Board & Terminal Block attached) into the Control Box
using the four screws from the previous installation.
Figure 13: Circuit Board (New Gen 2, V3)
8.
Attach all connectors to Circuit Board according to wiring diagram and reference below. Re-connect
power cord and motor cord to Terminal Block according to wiring diagram(s).
Old circuit board
number
CONNECT TO
New circuit board
number
CN2
CN4
CN1
CN1
CN3
CN3
M2
M2
L2
L2
M1
220V M1
L1
220V L1
Summary of Contents for PFLUX2
Page 12: ...Mobile Dust Cyclone Manual 11 CONTROL PANEL Figure 1A Control Panel...
Page 40: ...Mobile Dust Cyclone Manual 39 EXPLODED VIEWS PARTS 2021 10 14 SECTION A Close up view...
Page 41: ...Mobile Dust Cyclone Manual 40 SECTION B Close up view...
Page 42: ...Mobile Dust Cyclone Manual 41 SECTION C Close up view...
Page 43: ...Mobile Dust Cyclone Manual 42 SECTION D Close up view...
Page 44: ...Mobile Dust Cyclone Manual 43...
Page 50: ...Mobile Dust Cyclone Manual 49 2021 Laguna Tools 120221...