
LAGUNA
TOOLS
9
6.
Approaching
the
machine
from
the
side,
lift
the
machine
on
the
frame
taking
care
that
there
are
no
cables
or
pipes
in
the
area
of
the
forks.
7.
Move
the
machine
to
the
required
position
and
lower
gently
to
the
floor.
8.
Level
the
machine
so
that
all
the
supporting
feet
are
taking
the
weight
of
the
machine
and
no
rocking
is
taking
place.
SETTING
UP
THE
ELECTRICAL
CABINET
1.
Position
the
electrical
cabinet
so
that
it
is
perpendicular
to
the
machine.
See
figure
3.
2.
Adjust
the
feet
on
the
lower
shelf
legs
until
the
electrical
cabinet
is
stable.
3.
Mount
the
monitor
on
the
top
of
the
cabinet.
Hardware
to
mount
the
monitor
includes
an
M8
bolt,
wing
nut,
and
washer.
See
figure
6.
4.
Place
the
PC
on
the
lower
shelf
on
the
backside
of
the
machine.
See
figure
4.
4.1
Have
the
front
of
the
PC
face
the
machine
so
that
the
computer’s
fan
faces
away
from
the
machine.
This
is
to
help
reduce
the
amount
of
dust
that
will
enter
the
PC’s
vents.
4.2
Leave
a
gap
between
the
PC’s
vents
and
the
back
panel
of
the
machine.
This
will
prevent
the
PC
from
overheating.
5.
Connect
PCI
cables
to
PC.
Cables
are
labeled.
Note:
The
machine
will
malfunction
if
the
PCI
cables
are
connected
incorrectly.
6.
Route
power
to
the
machine
for
the
PC.
CONNECTING
POWER
Figure
3.
Electrical
cabinet
positioned
perpendicular
to
the
machine
Figure
4.
PC
tower
positioning
and
monitor
mounting
Figure
6.
Monitor
mounting
hardware
Figure
5.
PCI
cable
connections
Summary of Contents for CNC Swift Series
Page 54: ...LAGUNA TOOLS 54 SPECIFICATIONS...