Page 68
Note: In the Lead Lag Follower Sub-Menu, Identify
each control
(including the Lead Lag Master)
as a
Follower by turning on ‘Follower Enable.
From the Status Summary Screen, press the ‘Config-
ure’ button.
Scroll down and press ‘Lead Lag Follower Configura-
tion’
Press ‘Disabled’’
Choose ‘Enable Follower for built-in Lead Lag Master’
Then press ‘OK’.
The lead boiler (Master control) is now configured.
8.G.18 Lead Lag Leader
Config (continued)
LAARS Heating Systems
Summary of Contents for Neotherm NTH
Page 4: ...LAARS Heating Systems...
Page 36: ...Page 36 Figure 22 Hydronic Piping Single Boiler Zoning with Circulators LAARS Heating Systems...
Page 52: ...Page 52 Figure 36 Ladder Diagram 7 H Ladder Diagram LAARS Heating Systems...
Page 100: ...Page 100 Parts Illustration 4 Internal Components Sizes 750 850 LAARS Heating Systems...
Page 102: ...Page 102 Parts Illustration 6 Gas Train Components Sizes 600 850 LAARS Heating Systems...