
Tradesman Construction Heaters
Owner’s Manual • Tradesman
23
-- Igniter continues to spark until
fl
ame proving occurs.
-- Ignition spark is cut off.
-- Gas valve stays open.
-- Room warms to desired temperature.
-- Thermostat is satis
fi
ed.
-- Heater shuts down.
-- Process starts again on a call for heat.
IGNITION FAILURE SEQUENCE:
-- Trial for ignition takes approximately 10 seconds.
-- If ignition module does not sense a
fl
ame within the
ignition trial, the module goes into safety lockout (3
fl
ash pattern).
-- Gas valve closes.
-- Ignition spark shuts off.
-- Fan motor stops. (See note below).
-- To retry for ignition, the systems must be reset:
-- Turn the thermostat down and then up to call for
heat or unplug heater and plug it back in.
NOTE: Tradesman 170 Standard Heaters:
If ignition failure occurs, the fan
motor continues to operate.
Summary of Contents for Tradesman 400 Dual Fuel
Page 38: ...Tradesman Construction Heaters www lbwhite com Owner s Manual Tradesman 38 Notes...
Page 61: ...Calefactores Tradesman para construcciones www lbwhite com Manual del usuario Tradesman 22...
Page 78: ...Calefactores Tradesman para construcciones Manual del usuario Tradesman 39 Notas...
Page 101: ...Fournaises de construction Tradesman www lbwhite com Manuel du propri taire Tradesman 22...
Page 114: ...Fournaises de construction Tradesman Manuel du propri taire Tradesman 35...