5 | Commissioning
Mount the pipette
Fig. 14:
To correct in Y direction, use a 3 mm Allen wrench. To control the outcome, slide the Visionbox below the camera.
p) If the image displayed is satisfactory, slightly re-tighten the 2.5 mm screw be-
hind the Visionbox.
q) Click button [Next] or press the “Next” button.
ð
The calibration target is positioned on the component tray.
r) To close the wizard click the X pushbutton top right.
ð
The Rework System is calibrated.
5.3 Mount the pipette
Select the largest possible pipette for the component.
a) Wait for the heating head to cool down.
CAUTION
Risk of burning due to heated machine parts and PCB!
All heated machine parts as well as the surrounding housing parts and product sup-
port frame, the circuit board and the components become hot even during warm-up
to the process temperature [Tinit]!
Parts are particularly hot during the soldering process! After the soldering process,
wait until the device and the PCB have cooled down and reached non-hazardous tem-
peratures!
a) Switch to tab [Rework].
b) Click tab [Manual Mode] to view the button row for manual operation.
c) Click the “Pipette” pushbutton
9
10
11
12
13
ð
A submenu with further pushbuttons is displayed:
d) Press the pushbutton (10) until the pipette and its holder have moved far
enough downwards.
Ersa GmbH
Operating_instructions HR 500 DE 3BA00246-01 | Rev. 1
49 / 124