OC60-E2, OC95-E2, WSM
ENGINE
S-53
Magnet Switch (OC60-E2)
1. Check the continuity across the C terminal (1) and the B
terminal (2) with an ohmmeter, pushing in the plunger.
2. If not continuous or if a certain value is indicated, replace the
solenoid switch.
3. Pull the pull-rod to check the spring built in the plunger.
Magnet Switch (OC95-E2)
1. Check the continuity across the C terminal (1) and the B
terminal (2) with an ohmmeter, pushing in the plunger.
2. If it dose not conducts, check the contacts.
(1)
C Terminal
(2)
B Terminal
0000009316E
(1)
C Terminal
(2)
B Terminal
0000009317E