19
ASSEMBLY INSTRUCTIONS
3. Install the other lock nuts to the cable ends and adjust
the location of lock nuts so that the cable end hole
aligns with the spool hole. Then connect the cable to
the spools with pins.
4. Loosen the M6 lock nuts of the cable ends. Turn the
cable ends and spools so that the direction of the pins
should be as shown in the figure. Then retighten the
M6 lock nuts.
A
To reposition the cables for correct connections, use
the M16 lock nuts.
5. Tighten up the lock nuts at both sides of the valve stay
to secure the cables in place.
C
Control valve cover section
1. Attach the valve cover to the valve stay.
A
In case the hydraulic hose contacts the valve cover,
readjust the angle of hose.
(1) Cable (Blue, Boom section)
(2) Cable (Red, Bucket section)
(3) Valve stay
(4) 2-M16 lock nuts
(5) Spool (Boom section)
(6) Spool (Bucket section)
(7) 2-Pins
2-Snap pins
(1) 2-M6 lock nuts
(1) 4-M16 lock nuts
Tightening Torque
60.0 to 80.0 N-m
(6.1 to 8.2 kgf-m)
(44.3 to 59.0 ft-lbs)
(1) Valve cover
(2) 3-M8 x 20 bolts with washers