Amaprop
R
4
1.3
Checking the Parts Prior to Installation
Before beginning with the installation work, check that the installation parts and accessories are complete and have suffered no
in--transit damage.
15 ST Amaprop 1200--1801
15 STR Amaprop 2000--2500
(Standard)
15 STRV Amaprop 2000--2500
Option with adjustable feet
For tanks with a
max. floor gradient of
1,5
°
For tanks with a gradient of 0,5
°
and
max. surface irregularities of 15 mm
For tanks with a max.
floor gradient 1,5
°
4 braces
2 prefabricated bracings
2 prefabricated bracings with
2 preassembled feet each
For tanks with a
max. floor gradient
of 0,5
°
4 braces
Rigid feet
Adjustable feet
Rigid feet
Adjustable feet
15 LS Pump bracket Amaprop 1200--1801
15 LS Pump bracket Amaprop 2000--2500
10 x 4 x
3 x
1 x
M 16 x 190
M 16 x 70
M 12 x 45
M 16 x 160
2 x
1 x
3 x
Loctite
Upat UPW 44 CX 150 (Mortar for installation)
2 x
4 x
3 x
1 x
10 x
5 x
2 x
1 x
1 x
M 16 x 190
M 20 x 65
M 20 x 80
M 12 x 45
M 16 x 160
Loctite
Upat UPW 44 CX 150
(Mortar for installation)
Note:
The composite anchor bolts are supplied in two original manufacturer’s packages. Anchor rods with washers, nuts and mortar
cartridges. Each package contains 10 composite anchor bolts (8 required, 2 spares).
15 FUR Guide rail