Caution
Amaprop
R
22
Then use a crane to pull this assembly upright and position it
with its retaining brackets in the installation position shown in
the installation plan.
Make sure to use suitable lifting tackle for square rails! Observe
health and safety regulations as well as any regional
regulations. Adjust the feet so that the guide rail is in perfectly
vertical position; note the jet direction.
Vertical alignment of guide rail using a spirit level
Secure the M16x55 bolts connecting the braces with the feet
using Loctite and tighten to 150 Nm with a torque wrench. Do
not forget to fit the lock nuts!
Mark out and drill the holes for the composite anchor bolts. Drill
bit diameter 18 mm; bore depth 125 mm. Even level foundation
floors have site--related tolerances. Therefore, the 4 holes for
the feet should only be drilled when the feet rest fully on the tank
floor (use slotted holes to adjust)! The hole pattern data for the
composite anchor bolts (dimensions F
A
, F
B
, F
C
) are for
orientation only; it is important that the feet rest fully on the floor!
Observe the installation instructions for the composite anchor
bolts given in section 3.1.
Note:
On size 2000--2500, adjustment via the slotted holes is limited
by the welded construction of the bracing assembly; for full
contact between the feet and the tank floor fill any remaining
gaps with UPAT chemical mortar (see section 7.8). Observe the
application instructions given on the supplementary sheet! The
mortar can only be applied when the tank is empty and dry. Do
not apply if there is still some minimal water level in the tank
(rainfall). The mortar cannot be applied by divers.
Any unfilled gaps remaining will result in
increased stresses on the composite anchor
bolts.
This may damage the composite anchor bolts, the mixer and
the installation parts.
Inadequate filling of any gaps remaining can invalidate any
liability of the manufacturer for consequential damage.
Drill a hole with Ø 18 mm and clean it (e.g. with compressed air).
Verify bore depth (125 mm).
Please note!
A bulge needs to form here! Please refer to sec-
tion 3.1!
It is imperative to observe the embedment depth (thread--free
section on the anchor bolt) and the manufacturer’s application
instructions!