32
922-20207011/1.0
Regular maintenance checkups are especially important for long-term deployments of
the Flexview.
a
If the anode is more than two thirds consumed, the anode must be replaced.
b
If the anode still has a “new metal shine”, then it isn’t working. Re-inspect the
electrical connections.
Caution
Never paint the anodes.
Mounting the Sonar Head
Mounting the Sonar Head in the correct location and orientation is vital to ensure optimal
performance of the system.
Prerequisites
• To install the Flexview, you must have basic mechanical skills. We recommend two
people do the installation together.
• We assume that you are equipped with a standard set of tools. This tool set must comprise
the normal tools for mechanical tasks. This includes different screwdriver types, pliers,
adjustable spanners, etc. Depending on the chosen installation method, additional tools
may be required.
• You will need a mounting bracket that attaches to the Flexview.
• Ensure the anode and isolation pad are properly installed to prevent the Sonar Head’s
aluminium housing from corroding.
Caution
The Sonar Head’s black polyurethane transducer is delicate. Avoid impacts to the
transducer when installing or handling the Flexview.
Prolonged exposure to ultra-violet rays and excessive heat may damage the surface of
the polyurethane transducer face. Always store the Flexview in the provided equipment
case when not in use. If the Flexview is mounted on an ROV, cover the transducer when
not in use.
Flexview Installation Manual
Summary of Contents for Flexview
Page 1: ...Installation Manual Flexview Multibeam Sonar ...
Page 2: ......
Page 8: ...6 922 20207011 1 0 Flexview ...
Page 95: ...922 20207011 1 0 93 Flexview Sonar Head 500 kHz outline dimensions Drawing file ...
Page 96: ...94 922 20207011 1 0 Flexview Installation Manual ...
Page 97: ...922 20207011 1 0 95 Drawing file ...
Page 99: ...922 20207011 1 0 97 Drawing file ...
Page 100: ...98 922 20207011 1 0 Flexview Installation Manual ...
Page 126: ... 2019 Kongsberg Mesotech ...