HIGH REACH DEMOLITION EQUIPMENT 27M
TRANSPORTATION (high reach demolition equip-
7-49
DISCONNECT THE EQUIPMENT FROM THE BASE MACHINE
14. Relieve the pressure in the hydraulic circuits by removing the
filler cap from the hydraulic oil tank and operating the controls
of the machine.
CAUTION
Make sure that all equipment is clean at all times when
removing hydraulic power lines. Particularly ensure that no
foreign matter enters the hydraulic circuit. When hydraulic
lines are separated, make sure that all open ends are
plugged.
15. Disconnect the banked hydraulic connectors on the top of the
demolition first boom.
(A - connect; B - disconnect).
16. Disconnect the individual hydraulic connections around the
demolition first boom.
17. Separate the grease hoses and protect the exposed ends in
the same way as the main hydraulic lines. Plug the open end
of the tube with end fittings (heads), supplied as loose parts
with the machine.
18. Remove the safety plates from the first boom release pins.
(Step 15) Top
(Step 19) Both sides
of boom
of boom
(Step 18) Both
sides of boom
A
B
C
D
Safety
Plate
Summary of Contents for PC450-8
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Page 351: ...SPECIFICATIONS 15 ...
Page 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Page 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Page 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Page 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Page 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Page 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Page 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Page 469: ...INDEX 18 ...
Page 470: ...INDEX 8 2 ...
Page 473: ...COLOPHON 18 ...