HIGH REACH DEMOLITION EQUIPMENT 27M
DEMOLITION DIGGING BOOM INSTALLATION
7-37
11. Operate the "Attachment Rotate" function. Left Hand (LH) button makes the pins retract, Right Hand (RH) but-
ton makes the pins extend.
CAUTION
An assistant should check the movement of the extending pins as they locate onto the digging boom. The
assistant should warn the machine operator if there is a problem. Damage could occur if the pins are not
correctly aligned.
WARNING
q
Never use ANY other control to cause the hydraulic pins to move. This could cause injury, damage or
death.
q
Make sure that the assistant and all other personnel are not positioned where risk of injury can occur.
12. Attach the safety plates to the exposed ends of the adjustable pins.
13. Close the valves on the left and right side of the demolition first boom to isolate the retractable pins.
(Step 15) Top
(Step 10, 11) Both sides
of boom
of boom
(Step 12) Both
sides of boom
A
B
C
D
Safety
Plate
a
b
pin retracts
pin extends
Summary of Contents for PC450-8
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Page 351: ...SPECIFICATIONS 15 ...
Page 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Page 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Page 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Page 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Page 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Page 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Page 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Page 469: ...INDEX 18 ...
Page 470: ...INDEX 8 2 ...
Page 473: ...COLOPHON 18 ...