
OPERATION
MACHINE OPERATIONS AND CONTROLS
3-135
5.
Turn fuel control dial (4) to a point midway between low
idling (MIN) and full speed (MAX).
NOTICE
When the work equipment is retracted, take care that it
does not interfere with the machine body or ground.
6.
Move right work equipment control lever (5) slowly in the
direction to pull in the bucket (D). Operate the lever to the
end of its travel and hold it in position for 30 seconds.
7.
Move right work equipment control lever (5) slowly in the
direction to push out the bucket (C). Operate the lever to
the end of its travel and hold it in position for 30 seconds.
8.
Next, move left work equipment control lever (6) slowly in the direction to pull in the arm (B). Operate the lever
to the end of its travel and hold it in position for 30 seconds.
9.
Move left work equipment control lever (6) slowly in the direction to push out the arm (A). Operate the lever to
the end of its travel and hold it in position for 30 seconds.
10. Repeat the operation in Steps 6 to 9 for 5 minutes.
11. Check that hydraulic oil temperature monitor (7) is display-
ing the correct temperature.
If the hydraulic oil temperature monitor is not displaying the
correct temperature (it is displaying low temperature),
repeat Steps 6 to 10 until the display is the correct temper-
ature.
(A) Display when temperature is correct: Monitor back-
ground (C) is blue
(B) Display when temperature is low: Monitor background
(C) is white
12. Check that engine coolant temperature monitor (1) dis-
plays the correct temperature.
(A) Display when temperature is correct: Monitor back-
ground (C) is blue
(B) Display when temperature is low: Monitor background
(C) is white
If it displays low temperature, carry out additional warm up
of the engine until engine coolant temperature monitor (1)
displays the correct temperature.
Summary of Contents for PC450-8
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Page 351: ...SPECIFICATIONS 15 ...
Page 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Page 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Page 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Page 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Page 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Page 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Page 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Page 469: ...INDEX 18 ...
Page 470: ...INDEX 8 2 ...
Page 473: ...COLOPHON 18 ...