
MACHINE OPERATIONS AND CONTROLS
OPERATION
3-132
1.
This machine is equipped with an automatic engine warm-up system, so if the engine water temperature is
below 30 °C after the engine is started, the engine warm-up operation starts automatically. When the engine
automatic warm-up operation starts, the engine speed is maintained at a speed higher than the normal low
idling speed.
If the engine water temperature goes above 30 °C or if the warm-up operation has been continued for more
than 10 minutes, the automatic warm-up operation is cancelled and the engine speed drops to the normal low
idling speed.
2.
Check that engine coolant temperature monitor (1) dis-
plays the correct temperature.
If it displays low temperature, use the procedure in Step 3
to carry out additional warm up of the engine until the mon-
itor displays the correct temperature.
(A) Display when temperature is correct: Monitor back-
ground (C) is blue
(B) Display when temperature is low: Monitor background
(C) is white
3.
Turn fuel control dial (2) to a point midway between low
idling (MIN) and full speed (MAX), run the engine under no
load at a mid-range speed until engine coolant temperature
monitor (1) displays the correct temperature.
(A) Display when temperature is correct: Monitor background
(C) is blue
(B) Display when temperature is low: Monitor background (C)
is white
If the engine coolant temperature monitor displays the correct temperature, the engine warm-up operation is com-
pleted.
After checking that the engine coolant temperature monitor displays the correct temperature, carry out the warm-
up operation for the hydraulic equipment.
NOTICE
Canceling automatic warm-up operation
If it becomes necessary in an emergency to cancel the automatic warm-up operation or to lower the
engine speed to low idle, do as follows.
Summary of Contents for PC450-8
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Page 351: ...SPECIFICATIONS 15 ...
Page 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Page 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Page 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Page 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Page 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Page 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Page 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Page 469: ...INDEX 18 ...
Page 470: ...INDEX 8 2 ...
Page 473: ...COLOPHON 18 ...