
ATTACHMENTS ANDD OPTIONS
MACHINE READY FOR ATTACHMENT
6-13
Hydraulic Circuit Connection
6
When connecting the attachment, connect the hydraulic circuit
as follows.
1.
Remove blind plug (1) at the end of the stop valve piping.
(Two spots on the left and right)
Be careful not to lose or damage any part that has been
removed.
2.
Connect attachment piping (2) provided by the attachment
maker to the part from which the plug was removed Step 1.
For the mouthpiece size and accumulator add-on, the
action to take differs according to the attachment manufac-
turer, so please consult your Komatsu distributor.
Summary of Contents for PC450-8
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Page 351: ...SPECIFICATIONS 15 ...
Page 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Page 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Page 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Page 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Page 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Page 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Page 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Page 469: ...INDEX 18 ...
Page 470: ...INDEX 8 2 ...
Page 473: ...COLOPHON 18 ...