MAINTENANCE
MAINTENANCE PROCEDURE
4-43
3.
Lower the work equipment to the ground and set the
machine in a stable condition.
4.
Set lock lever (1) to LOCK position (L) and stop the engine.
5.
Remove the floor mat holder plate (4).
6.
Pull the knob of floor mat holder clip (5) and remove clip
(5).
7.
Remove the floor mat.
8.
Remove the cap from water drain hole (3).
9.
Flush out the dirt on the floor directly with water through
water drain hole (3).
10. After completing the washing operation, install the cap in
water drain hole (3).
11. Fit the floor mat, then secure it with floor mat holder plate
(4).
12. Secure the floor mat in position with the floor mat holder
clip (5).
Summary of Contents for PC450-8
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Page 351: ...SPECIFICATIONS 15 ...
Page 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Page 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Page 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Page 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Page 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Page 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Page 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Page 469: ...INDEX 18 ...
Page 470: ...INDEX 8 2 ...
Page 473: ...COLOPHON 18 ...