3-52
PC290-ENG
5.
Boom-Arm coupling pin (1 point)
6.
Arm cylinder rod end (1 point)
7.
Bucket cylinder foot pin (1 point)
8.
Arm-Link coupling pin (1 point)
9.
Arm-Bucket coupling pin (1 point)
10. Link coupling pin (2 points)
11. Bucket cylinder rod end (1 point)
12. Bucket-Link coupling pin (1 points)
24.4.2 CHECK OIL LEVEL IN SWING MACHINERY
CASE, ADD OIL
The oil is at high temperature immediately after the machine
has been operated. Wait for the oil to cool down before carry-
ing out this check.
1.
Remove dipstick
G
and wipe the oil from the dipstick with a cloth.
2.
Insert dipstick
G
fully in the guide.
3.
When dipstick
G
is pulled out, if the oil level is between the H and L
marks of the gauge, oil level is proper.
WARNING
24. SERVICE PROCEDURE
Summary of Contents for PC290LC-6K
Page 2: ......
Page 44: ...1 32 PC290 ENG MEMO ...
Page 45: ...2 1 PC290 ENG OPERATION ...
Page 146: ...2 102 PC290 ENG MEMO ...
Page 147: ...3 1 PC290 ENG MAINTENANCE ...
Page 171: ...3 25 PC290 ENG 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS m n ...
Page 223: ...4 1 PC290 ENG SPECIFICATIONS ...
Page 225: ...4 3 PC290 ENG 25 SPECIFICATIONS PC290LC 6K ...
Page 226: ...4 4 PC290 ENG 25 SPECIFICATIONS PC290NLC 6K ...
Page 230: ...4 8 PC290 ENG 25 SPECIFICATIONS Mono Boom ...
Page 233: ...5 1 PC29 ENG OPTIONS ATTACHMENTS ...
Page 264: ...5 30 PC29 ENG MEMO ...